Advertisement

Charge
based on:-
Additional POE oil
NOTE: The new 50 Series CKC are supplied with a Nitrogen holding charge. See pages 12 & 13 for
refrigerant charge information.
5.
Run the system for a few minutes to allow it to stabilize. Where possible, charge to a sweat line on the
evaporator. Typical suction pressure on short lines at UK conditions should be approx. 3.8bar (55 psig).
6.
Head pressure controller
The head pressure controller is factory set to suit the refrigerant. It may be necessary to adjust this to
suit site conditions, to raise or lower the nominal head pressure.
a. With the system switched off, connect a high pressure gauge to the liquid line service valve.
b. Switch on the system, and run for a few minutes to stabilise.
c. The head pressure should be approximately:
R407C: 275-280 psig (18.9-19.6barg)
into setting screw. Turn allen key clockwise (+) or counter clockwise (-) to readjust the setting. Do not turn
setting screw more than 3 turns clockwise (+3). Use following table as a quick guideline for setting:
After adjustment, re-insert sealing plug and make sure that it is properly fitted. IP65 protection requires
firmly sealed plug
NOTES:
Tolerances for condensing temperatures setpoint: ±2K
Min fan speed (0 rpm) and fan cut in pressure 200 psig (13.8 barg) are factory set and not adjustable.
NOTE: The condenser fan may stop if the operating pressure drops below 200 psig (13.8 barg)
Liquid line
1/4"
3/8"
25 g/m
60 g/m
25g per 350g of additional refrigerant to a maximum of 300g
to achieve this remove sealing plug and insert 2mm or 5/64" allen key
11/19
Expansion line
3/8"
1/2"
16 g/m
30 g/m
5/8"
48 g/m
55908061-01