QUICK REFERENCE GUIDE - USE
Nimbus 4 & Nimbus Professional
Install mattress and pump
1
Place mattress on bed base,
tubeset and CPR at foot end.
Use the fastener straps to attach
the mattress to moving parts of
bed frame.
4
FAST DEFLATE
1
2
3
Check that the transport control is
set to Normal and the CPR control
is closed and locked in position.
7
Connect the mains power cable
to the pump and to mains power
outlet.
Inflate mattress
1
WARNING
CPR control must be visible
and accessible at all times.
•
CPR control closed and locked
in position.
•
Transport control set to Normal.
•
All Vent Valves closed.
2
Zip the protective cover over the
mattress with the Arjo logo visible
and located at the foot end.
5
NORMAL
TRANSPORT
Attach the bed bracket to the
bed frame, or place the pump
underneath the bed.
8
8
WARNING
Mains power cable and
tubeset must be positioned
to avoid trip hazard, and
be clear of moving bed
mechanisms or other
entrapment areas.
2
Press the Run/Standby button.
Wait until the mattress is fully
inflated.
649936EN_01 • 05/2020 • Page 1/2
3
Make sure that all the Vent Valves
are closed
6
Connect the tubeset to the pump
and the mattress.
Run the mains power cable along
the side of the mattress securing
the flap round the cable using the
press studs.
3
Once the Wait and Low Pressure
15 min
indicators turn off, place the patient
on the mattress in supine (face up)
position.
The default setting is Dynamic
mode (alternating pressure).
Closed
Open
1
2
Need help?
Do you have a question about the Nimbus 4 and is the answer not in the manual?
Questions and answers