5.3. Commissioning

This chapter contains all important instructions for oper-
ating personnel for safe commissioning and operation of
the machinery. The following must be complied with and
checked:
Type of installation
Operation mode
Minimal submersion in water / maximum submersion
depth
After a longer downtime these points must also be
checked and detected defaults must be repaired!
The operation and maintenance manual must always
be kept with the machinery, or in a dedicated place
where it is accessible for the entire operating person-
nel.
The following points must be taken into account to avoid
personal and material damage when troubleshooting ma-
chinery failures:
The commissioning of the machinery must only be
carried out by qualified and trained personnel in com-
pliance with the safety regulations.
All personnel that is working on the machinery must
have received, read and understood the operating in-
structions.
Activate all safety equipment and emergency switch-
offs before commissioning.
Electrotechnical and mechanical settings must only
be carried out by specialists.
This machinery is only suitable for the use under the
indicated operating conditions.
Never let the pump run dry for longer periods of time
(risk of overheating).
Before commissioning the system, existing pipe
valves or gate valves must be opened.

5.4. Preparatory work

The machinery was constructed and fitted according to
the latest technology, so that it works for a long time and
reliably under normal operating conditions. This requires
however that you comply with all requirements and infor-
mations. Small oil leakages of the floating ring seals on de-
livery are not problematic, but they must be removed be-
fore lowering/immersion into the medium. Please check
the following points:
Cable run - no loops, slightly tightened
Check temperature of the medium and submersion
depth
If a tube is used for pressure, this must be rinsed with
clear water so that no deposits lead to obstruction.
The pressure-sided and suction-sided pipework sys-
tem must be cleaned and all gate valves must be
opened
The pump casing must be flooded, e.g. it must be
filled completely with the medium and it must not
contain an air. The de-aeration can be carried out by
means of suitable venting devices in the system or, if
32 | ENGLISH
available, by air-vent screws on the pressure socket.
Check accessories, pipework, suspension devices for
firm and correct fitting
Check available level controls/protection against dry
run

5.5. Electrical system

The respective local and VDE regulations must be com-
plied with when choosing and installing the electrical
leads as well as connecting the motor. The motor must be
protected with a circuit breaker. The motor must be con-
nected according to the wiring diagram. Note the direction
of rotation! In the event of wrong direction of rotation the
machine does not perform as indicated and it can become
damaged under unfavourable circumstances.
Electric shock hazard!
Faulty dealing with current may jeopardize your life!
All pumps with free cable ends must be connected by
a qualified electrician.
A professional inspection prior to commissioning
must ensure that the required electrical protective
measures are available. The grounding, earthing,
isolating transformer, and fault current or voltage
fault protection switch must meet the requirements
of the responsible power plant.
The voltage specified in the Technical Data must cor-
respond to the available mains voltage.
Make sure that the electrical connections are in a
flood-safe area and are protected from moisture. The
power cord and plug must be checked for damage
before use.
The end of the connecting cable must not be sub-
merged in water, as this may allow water to infiltrate
into the motor connection room.
The electrical connection must be carried out in accor-
dance with the local regulations of the utility company or
VDE. The supply voltage and frequency are indicated on
the type plates on the pump and the switching device.
The voltage tolerance must be within +6% to - 10% of the
mains voltage. It must be ensured that the data listed on
the type plates is in agreement with the existing power
supply. The lifting units require no additional motor pro-
tection.
The pump motors have a built-in thermal switches in the
motor windings, which shut off the pump via the connect-
ed switchgear in case the motor overheats or is overload-
ed. No additional motor protection is required.
5.5.1 Electronic control unit (Saniquick BT)
The switchgear supplied with the system contains its
own operating instructions. Please read these to be able
to operate the control unit.
5.6. Motor protection
The minimum requirement is a thermal relay / motor pro-
tection switch with temperature compensation, differen-
tial triggering and an anti-reactivation device in accordance
with VDE 0660 or the appropriate national regulations.