Mellanox Technologies 1G Switch Air Duct Rail Kit Quick Installation Manual

Mellanox Technologies 1G Switch Air Duct Rail Kit Quick Installation Manual

Advertisement

Quick Links

1U Switch Enterprise Rack
Air Duct Kit
Quick Installation Guide
Model: 1G Switch Air Duct Rail Kit
www.mellanox.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the 1G Switch Air Duct Rail Kit and is the answer not in the manual?

Questions and answers

Summary of Contents for Mellanox Technologies 1G Switch Air Duct Rail Kit

  • Page 1 1U Switch Enterprise Rack Air Duct Kit Quick Installation Guide Model: 1G Switch Air Duct Rail Kit www.mellanox.com...
  • Page 2: Pay Attention

    Pay Attention! • All servers and systems in the rack should be planned with the airflow direction. All FRU components must have the same air flow direction. A mismatch in the air flow will affect the heat dissipation. Package Contents •...
  • Page 9 Stacked Installation (Optional) • For stacked installation of adjacent switch assemblies in a rack, the system on top should be installed without its floor, in order to allow easier access to the power supply units. To remove the floor, unscrew four screws on each side of the system.
  • Page 10 • The two modes are shown in the following figure: • Slide the front panels towards the switches, and tighten the captive screws.