STA-RITE SG12 Series Installation, Operation & Parts Manual page 4

Grinder pumps
Table of Contents

Advertisement

Available languages

Available languages

3
2
4
1
1939 0895
SG12/SGC12/SG13/SGC13
9
11
5
10
The assembly
sequence for the
moveable parts
(Steps 9 and 10)
differs from
SG12/SGC12/
SG13/SGC13 to
SGC20 models.
Follow the sequence
that is correct for
your pump.
1936 0895
12
1935 0895
6
7
1938 0895
NOTICE
1934 0895
4
8
SGC20
10
9
1933 0895
Figure 4: Assembly sequence for
Guide Rail Lift-out System, Models
SG12/SGC12, SG13/SGC13 and
SGC20. Follow the numbered steps to
assemble and install your Lift-Out sys-
tem.
Notice that, for the SGC20, the assem-
bly sequence for the Guide Rail
Bracket, the Ball Check Valve, the
Movable Flange, and associated parts
differs from the SG12/SGC12 and
SG13/SGC13. This difference is
required by the difference in size
between the two pumps.
Make sure that you use the correct
sequence for your pump or the piping
assembly will not mount on the pump
or on the guide rails.
1937 0895