Start-Up Checklist - Bryant DURAPAC PLUS 581B Installation & Service Instructions Manual

Single package rooftop gas heating/electric cooling units
Hide thumbs Also See for DURAPAC PLUS 581B:
Table of Contents

Advertisement

I. PRELIMINARY INFORMATION
MODEL NO.: _________________________________
DATE:________________________________________
II. PRE-START-UP (insert checkmark in box as each item is completed)
VERIFY THAT JOBSITE VOLTAGE AGREES WITH VOLTAGE LISTED ON RATING PLATE
VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
REMOVE ALL SHIPPING HOLDDOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
CHECK GAS PIPING FOR LEAKS
CHECK THAT RETURN (INDOOR) AIR FILTERS ARE CLEAN AND IN PLACE
VERIFY THAT UNIT INSTALLATION IS LEVEL
CHECK FAN WHEELS AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS
CHECK TO ENSURE THAT ELECTRICAL WIRING IS NOT IN CONTACT WITH REFRIGERANT LINES
OR SHARP METAL EDGES
CHECK PULLEY ALIGNMENT AND BELT TENSION PER INSTALLATION INSTRUCTIONS
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS
INDOOR-FAN AMPS
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
RETURN-AIR TEMPERATURE
COOLING SUPPLY AIR
GAS HEAT SUPPLY AIR
PRESSURES
GAS INLET PRESSURE
GAS MANIFOLD PRESSURE
REFRIGERANT SUCTION
REFRIGERANT DISCHARGE
VERIFY REFRIGERANT CHARGE USING CHARGING TABLES
VERIFY THAT 3-PHASE SCROLL COMPRESSOR ROTATING IN CORRECT DIRECTION
Copyright 2005 Bryant Heating & Cooling Systems

START-UP CHECKLIST

(Remove and Store in Job File)
L1-L2
L2-L3
L1
L2
L1
L2
DB
DB
DB
DB
IN. WG
IN. WG
PSIG
PSIG
Printed in U.S.A.
SERIAL NO.:________________________________________
TECHNICIAN: ______________________________________
L3-L1
L3
L3
WB
CL-1
CATALOG NO. 04-53581002-01

Advertisement

Table of Contents
loading

Table of Contents

Save Article as PDF