CAUTION Please read all precautions and instructions in this manual before using this equipment. BEFORE YOU START Read all instructions in this manual before assembling or using this equipment. Remove all parts from the packaging and separate and count each various component to ensure everything has been correctly provided.
Page 3
Securely tighten all Nuts and Bolts after all components have been assembled in current and previous steps. NOTE: Do not over tighten any component with pivoting function. Make sure all pivoting components are able to move freely.
ASSEMBLY MANUAL Parts list-1 (individual packaging) Rear riser assembly*2 Center column assembly* NO 1 Base welding sets*2pcs NO 2 NO 3 2pcs Optical axis fixing Middle connection NO 4 Top component*2pcs NO 5 NO 6 group*2pcs components*1pcs Upper beam assembly*1 Lower connection Functional trainer right NO 7...
Page 5
Left safety welding set Left safety welding Left parallel bar welding NO 16 NO 17 NO 18 *1pcs set*1pcs group *1pcs Parts list-2 (individual packaging) Right parallel bar Lifting welding Low pull welding NO 19 NO 20 NO 21 welding group*1pcs group*1pcs group*1pcs Lat Pulldown welding...
Page 6
Parts list-3 (assembly parts) NO 30 Right upper cover *2pcs NO 31 Left upper cover*2pcs NO 32 Right lower cover *2pcs NO 33 Left lower cover*2pcs NO 34 Cover for stack*2pcs NO 35 sticker plate *1pcs Olympic Chrome Stainless steel conduit NO 36 NO 37 NO 38...
Page 7
Parts list-4 (assembly parts) NO 48 Chain 0.35m*2pcs NO 49 T bolt*1pcs NO 50 Locker *2pcs Weight stack NO 51 Tricep Dip rope*1pcs NO 52 NO 53 Weight stack rubber*4pcs bushing*76pcs Weight stack guide Weight stack - NO 54 NO 55 NO 56 Cable*2pcs sleeve *4pcs...
Page 8
Blister pack screw schedule-5 (standard parts) Hexagon flat head screw Hexagon flat head Hexagon flat head screw M10*100*46pcs screw M10*70*4pcs M10*60*18pcs Hexagon flat head screw Hexagon socket head Locknut M10*70pcs M10*20*19pcs screw M5*10*8pcs Flat washer Ø10*70pcs...
Assembly steps Step NO Item NO Name Quantity Item NO Name Quantity NO 1 Base welding group Tools Put two Base welding group on the ground,keep in same direction and 1.2m distence...
Page 10
Assembly steps Step NO Item NO Name Item NO Name NO 2 Rear riser assembly Hexagon flat head screw M10*60 Flat washer Ø10 Locknut M10 Tools No.6 hexagon socket screw driver,wrench Put the Rear riser assembly on the base as shown in the picture, pay attention to the upper and lower ends.
Page 11
Assembly steps Step NO Item NO Name Item NO Name Middle connection NO 6 components Hexagon flat head screw M10*100 Flat washer Ø10 Locknut M10 Tools No.6 hexagon socket screw driver,wrench Assemble the parts as shown in the pictures,pay attention to the tube with holes, keep in inside...
Page 12
Assembly steps Step NO Item NO Name Item NO Name Lower connection NO 8 component Hexagon flat head screw M10*100 Flat washer Ø10 Locknut M10 Tools No.6 hexagon socket screw driver,wrench Assemble Lower connection parts as shown in the pictures...
Page 13
Assembly steps Step NO Item NO Name Item NO Name NO 3 Center column assembly Hexagon flat head screw M10*20 Tools No.6 hexagon socket screw driver Assemble the parts as shown in the pictures,pay attention to the upper and lower...
Page 14
Assembly steps Step NO Item NO Name Item NO Name NO 4 Top component Locknut M10 Hexagon flat head screw M10*60 Hexagon flat head screw M10*20 Flat washer Ø10 Tools No.6 hexagon socket screw driver,wrench Install the top parts as shown in the picture, do not tighten the screws temporarily, just hang them, so as to facilitate the later assembly of other accessories...
Page 15
Assembly steps Step NO Item NO Name Item NO Name NO 5 Optical axis fixing group NO 55 Weight stack -350 NO 39 cover optical axi NO 53 Weight stack rubber Weight stack guide Hexagon flat head NO 54 sleeve screw M10*60 Pully and weight stack NO 25...
Page 16
Assembly steps Step NO Item NO Name Item NO Name Optical shaft sleeve Right Smith NO 13 NO 24 welding group Insurance Group NO 38 Smith optical axis NO 45 Bottom nylon sleeve NO 47 Protection guide sleeve Left Smith Insurance NO 23 Group Tools...
Page 17
Assembly steps Step NO Item NO Name Item NO Name Functional trainer right NO 9 Flat washer Ø10 pully Functional trainer Left NO 10 Locknut M10 pully NO 37 Stainless steel conduit Hexagon flat head screw M10*70 Tools No.6 hexagon socket screw driver,wrench The lettering surfaces of the regulating tube are installed facing inwards, the lettering sequence is from bottom to top, and the left and right adjustment groups are assembled in the same way.
Page 18
Assembly steps Step NO Item NO Name Item NO Name Push combination NO 11 assembly Hexagon flat head screw M10*20 Locknut M10 Flat washer Ø10 Tools No.6 hexagon socket screw driver,wrench Install the push bar as shown in the picture...
Page 19
Assembly steps Step NO Item NO Name Item NO Name NO 56 cable NO 43 Rubber cover NO 40 Safety hook NO 44 Small aluminum cap NO 41 Low pull bar NO 42 Card slot set Tools No.4 ,6hexagon socket screw driver,wrench Note that the two ends of the wire rope are divided into large and small ends, pay attention to the direction of the joint, and remove the two pulleys at the bottom of the base when threading.
Page 20
Assembly steps Step NO Item NO Name Item NO Name NO 30 Right upper cover Locknut M10 NO 31 Left upper cover Hexagon flat head screw M10*100 Flat washer Ø10 Tools No.6 hexagon socket screw driver,wrench As shown in the picture, please note that no screws are installed in the two holes marked, which are reserved for the next installation of the beam.
Page 21
Assembly steps Step NO Item NO Name Item NO Name NO 7 Upper beam assembly Hexagon flat head screw M10*100 Flat washer Ø10 Locknut M10 Tools No.6 hexagon socket screw driver,wrench As shown in the picture, install Upper beam parts...
Page 22
Assembly steps Step NO Item NO Name Item NO Name NO 34 Cover for stack NO 35 sticker plate Hexagon flat head screw M10*20 Hexagon socket head screw M5*10 Tools No.4,6 hexagon socket screw driver Note that the hook of the sticker plate is installed inward.
Page 23
Assembly steps Step NO Item NO Name Item NO Name NO 12 Barbell bar welding group NO 46 Protective ring Hexagon flat head screw M10*20 Tools No.6 hexagon socket screw driver,wrench As shown in the picture, install the barbell rod welding parts...
Page 24
Assembly steps Step NO Item NO Name Item NO Name Left parallel bar NO 14 Left hook welding group NO 18 welding group Right hook welding Right parallel bar NO 15 NO 19 group welding group NO 16 Left safety welding set NO 17 Right safety welding set Tools...
Page 25
Assembly steps Step NO Item NO Name Item NO Name NO 32 Right lower cover Locknut M10 NO 33 Left lower cover Hexagon flat head screw M10*100 Flat washer Ø10 Tools Pay attention to distinguish the left and right guard plates, as shown in the picture, the large hole guard plate is on the...
Page 26
Assembly steps Step NO Item NO Name Item NO Name Hexagon flat head NO 26 Landmine Group screw M10*60 Hexagon flat head NO 28 Foot rack group screw M10*20 NO 29 Low pull pedal group NO 49 T Bolt Tools No.6 hexagon socket screw driver,wrench As shown in the picture, install the other components.
Page 27
Assembly steps Step NO Item NO Name Item NO Name NO 20 Lifting welding group NO 21 Low pull welding group NO 22 Lat Pulldown welding NO 27 Push bar welding Tools As shown in the figure, part of the unassembled parts and parts that are not used in the movement are hung on the label board to complete all assembly.
The replacement or repair provided for under the Force USA warranty is the responsibility of the user, and the customer will be responsible for any freight charges that apply. Force USA will not be liable for any consequential damages or breach of any implied warranty on the range of Force USA strength equipment.
Need help?
Do you have a question about the F100 and is the answer not in the manual?
Questions and answers