3.7
Solenoid valve maintenance
1/1
First carry out the operations described in schedule 3.B
"Rear part preliminary maintenance operations"
Adequately incline the machine and extract the two
power cables (C) and (B) and the earth cable (A)
from the solenoid valve.
Remove the pod drawer from the front part of the
machine.
Unscrew and remove the two self-locking nuts
shown in the diagram.
Remove the solenoid valve, unscrew the locking nut
from the teflon pipe (A) using a 10 mm spanner.
Extract the pipe (B) from the rubber-holder
connection.
Extract the solenoid valve.
"E
P
. M
" 120 V
C
. 83312 / R
. 1.00 / F
2003
SPRESSO
OINT MOD
ATINÈE
OD
EL
EBRUARY