Wieland podis
system
Manual V 1.03 / ref. no. 00.000.0059.0 / 28.03.2001
Once you have carried out this configuration step, you
project screen appears as follows:
You have now configured the PROFIBUS DP network
and the DP master. The next step is to integrate the
podis
DRIVE devices.
To do this, click once on the DP master system (thick
black/white line). This line then becomes a thick
transparent black line.
6.4.2
Inserting the podis
PROFIBUS system
Select "Further FIELD DEVICES" from the hardware
catalog
under
"PROFIBUS-DP"
"PROFIBUS interface" from the submenu "I/O" (see
screenshot on left-hand side).
You insert a podis
PROFIBUS system by double clicking on the PODIS
components.
DRIVE devices into the
and
DRIVE bus coupler into the
then
select