Download Print this page

Kirby Morgan 525-757 Manual page 5

Superflow 450 regulator parts upgrade kit

Advertisement

Installing Main Tube into Regulator Body
1. Ensure O-ring on main tube is in good condition and lubricated with one
of the noted approved lubricants.
© MMXV Kirby Morgan Dive Systems, Inc. All Rights Reserved
Kirby Morgan Dive Systems, Inc.
1430 Jason Way Santa Maria, California 93455
Phone: 805/928-7772
www.KirbyMorgan.com email: kmdsi@KirbyMorgan.com
6. Install the bearing clip onto the outside of the main tube. Note that
there is a locating pin on the clip that must engage the correct hole on
the main tube. There are also small recesses on either side that the
legs of the lever arm fit into. The clip is correctly positioned when it
is in the position shown.
NOTE: For ease of installation, the spring tension on the lever arm may
require the lever arm to be pulled more against the spring to align the
spacer.
2. Lubricate the internal area of the regulator with approved lubricant
where the main tube O-ring will insert. This is important to help pre-
vent this O-ring from possibly getting cut when it is installed.
Fax: 805/928-0342
Page 5 of 8
Document # 151006002
®

Advertisement

loading