Download Print this page

Spectra Logic 10K Library Preventative Maintenance Manual page 20

Advertisement

8. Select Display DSP Table to review the test results.
Test Status Column
Pay close attention to the Test Status Column—the first column on the left.
The first four rows should be ignored.
All other values in this column should be either 0 or 2.
Note:
If any number in the first column (after the first four rows) is either
a 1 or a 3, contact Spectra Logic Technical Support at (800) 227-4637
or (303) 449-0160, or send an e-mail to support@spectralogic.com.
9. Touch anywhere in the screen to exit the DSP trace window.
10. Select the Exit icon and then select Reset to return the unit to a known condition.
11. Remove the scratch tapes from the library.
12. Use your backup software to re-insert your data tapes into the library.
13. Verify that all drives respond to server commands and that the library boots up
correctly.
Spectra 10K Library Preventative Maintenance Guide
20
Error Code Buffer Column

Advertisement

loading
Need help?

Need help?

Do you have a question about the 10K Library and is the answer not in the manual?

Questions and answers