Installation; Boiler Plate; Blast Tube Length; Securing The Burner To The Boiler - Riello Burners RL 70/2 Installation, Use And Maintenance Instructions

Light oil burners
Table of Contents

Advertisement

inch
A
B
RL 70
7
"
10
" - 12
9 / 32
27 / 32
RL 100
7
"
10
" - 12
9 / 32
27 / 32
RL 130
7
"
10
" - 12
9 / 32
27 / 32
(A)
(B)
(C)
Nozzle
size
145 PSI
5.0
6.15
5.5
6.76
6.0
7.40
6.5
8.00
7.0
8.61
7.5
9.22
8.0
9.86
8.3
10.21
8.5
10.47
9.0
11.08
9.5
11.69
10.0
12.30
10.5
12.94
11.0
13.54
12.0
14.76
12.3
15.15
13.0
16.01
13.8
17.00
14.0
17.23
15.0
18.48
15.3
18.83
16.0
19.69
17.0
20.94
17.5
21.55
18.0
22.16
19.0
23.38
19.5
24.01
20.0
24.62
21.5
26.48
22.0
27.09
(D)
C
"
1 / 2
13 / 16
W
"
1 / 2
13 / 16
W
"
13 / 16
1 / 2
W
D690
GPH
MBtu/hr
174 PSI
174 PSI
203 PSI
6.79
7.40
951
7.46
8.13
1044
8.17
8.87
1144
8.84
9.60
1238
9.51
10.34
1331
10.18
11.08
1425
10.85
11.81
1519
11.27
12.26
1578
11.56
12.55
1618
12.23
13.29
1712
12.90
14.06
1806
13.58
14.76
1901
14.28
15.50
1999
14.95
16.23
2093
16.30
17.71
2282
16.71
18.16
2339
17.64
19.18
2470
18.73
20.27
2622
19.02
20.65
2663
20.37
22.16
2852
20.78
22.57
2909
21.74
23.63
3044
23.09
25.10
3233
23.76
25.84
3326
24.46
26.58
3424
25.81
28.05
3613
26.48
28.79
3707
27.15
29.52
3801
29.20
31.73
4088
29.86
32.47
4180

INSTALLATION

BOILER PLATE (A)
Drill the combustion chamber mounting plate as
shown in (A). The position of the threaded holes can
be marked using the burner gasket supplied with the
burner.
BLAST TUBE LENGTH (B)
The length of the blast tube must be selected accord-
D455
ing to the indications provided by the manufacturer of
the boiler, and it must be greater than the thickness of
the boiler door complete with its insulation. The range
of lengths available, L (inch), is as follows:
Blast tube 9):
• short
• long (with the kit)
For boilers with front flue passes 12) or flame inversion
chambers, protective insulation material 10) must be
inserted between the boiler's refractory 11) and the
blast tube 9).
This protective insulation must not compromise the ex-
traction of the blast tube.
For boilers having a water-cooled front, the insulation
10)-11)(B) is not required unless it is required by the
D2326
boiler manufacturer.
SECURING THE BURNER TO THE BOILER (B)
Disassemble the blast tube 9) from the burner 6) by
proceeding as follows:
- Loosen the four screws 3) and remove the cover 1).
- Remove the screws 2) from the two slide bars 5).
- Remove the two screws 4) fixing the burner 6) to the
flange 5).
- Withdraw the blast tube 9) complete with flange 7)
and slide bars 5).
COMBUSTION HEAD CALIBRATION
At this point check, for model RL 130, whether the
maximum delivery of the burner in high fire operation
is contained in area B or in area C of the firing rate.
See page 5.
If it is in area B then no operation is required.
If, on the other hand, it is in area C:
- Unscrew the screws 1)(C) and disassemble the
blast tube 5).
- Unscrew the screws 3) and remove the shutter 4).
- Tighten the screws 3) on the rod 2).
- Now refit the blast tube 5) and the screws 1).
Once this operation has been carried out (if required),
secure flange 7)(B) to the boiler plate inserting the
supplied gasket 8). Use the 4 screws provided after
having protected the thread with an antiseize product
(high-temperature grease, compounds, graphite). The
burner-boiler seal must be airtight.

CHOICE OF NOZZLES FOR LOW AND HIGH FIRE

Both nozzles must be chosen from among those listed
in Table (D).
The first nozzle determines the delivery of the burner
at low fire.
The second nozzle works in combination with the low
fire nozzle to determine the delivery of the burner at
high fire.
The total deliveries of low and high fire must be con-
tained within the value range indicated on page 3.
Use nozzles with a 60° spray angle at the recommend-
ed pressure of 174 PSI.
6
RL 70
RL 100
RL 130
9
27 / 32
9
27 / 32
9
27 / 32
15
15
15
5 / 32
5 / 32
5 / 32

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rl 100/2Rl 130/2

Table of Contents