To reset, press the pushbutton, no sooner than 10 s after the lock-out. Motor trip: release by pressing the pushbutton on ther- mal overload 17)(A). inch PACKAGING - WEIGHT (B) RL 190/M 1 / 4 15 / 32 1 / 2 ” ”...
FIRING RATES (A) RL 190/M During operation, burner output varies between: • MINIMUM OUTPUT: area A; • MAXIMUM OUTPUT: area B. The firing rate may be found by plotting a vertical line from the desired delivery and a horizontal line from the pressure in the combustion chamber.
Drill the combustion chamber mounting plate as shown inch in (A). The position of the threaded holes can be marked using the head gasket supplied with the burner. RL 190/M 1 / 6 ” 25 / 32 ” - 14 15 / 32 ”...
RL 190/M, maximum light oil delivery = 48 GPH Diagram (F) indicates that for a delivery of 48 GPH the RL 190/M Model requires the combustion head to be set to approx. three notches, as shown in Figure (E). D1222 D462 N°...
HYDRAULIC SYSTEM FUEL SUPPLY Double-pipe circuit (A) The burner is equipped with a self-priming pump which is capable of feeding itself within the limits listed in the table at the side. The tank higher than the burner A Distance "P" must not exceed 33 ft in order to avoid sub- jecting the pump's seal to excessive strain;...
SERVOMOTOR (A) The servomotor gives simultaneous regulation of the air damper through the adjustable profile cam 4)(F) and the pressure controller (A) pag. 11. It rotates by 130° in approx. 35 s. The factory settings must not be changed for the first fir- ing, just check that they comply with the details below.
BURNER CALIBRATION PRESSURE CONTROLLER The optimum calibration of the burner requires an analy- sis of the flue gases at the boiler outlet. The following settings that have already been made do not require modification under normal circumstances: • Combustion head; •...
BURNER STARTING Close the control circuit, with the switches in fig. (C) and Position jumpers Trim potentiometers (E) in the AUTO position. On firing turn the switch (C) to MAN. MAXIMUM OUTPUT Using button (B), "increase output" until it stops at app. Slide switch 130°...
BURNER OPERATION BURNER STARTING (A) - (B) • Operating control closes, the motor starts. The pump 3) draws the fuel from the tank through the piping 1) and pumps it under pressure for delivery. The piston 4) rises and the fuel returns to the tank through the piping 5) - 7).
FINAL CHECKS • Obscure the photocell and switch on the control circuit: the burner should start and then lock-out about after starting. • Illuminate the photocell and switch off the control devices: burner should go into lock-out. • Obscure the photocell while the burner is operating: flame should go out and burner lock out within 1 s.
1000 ft each - the corrected capacity is 3847 MBtu/hr; 20°F (305 m each 11°C) is applicable. Burner RL 190/M is OK - the corrected burner air pressure is 1.92. CORRECTED BURNER CAPACITY ACCORDING TO ALTITUDE Altitude m.
FLAME SIGNAL MEASUREMENT (A) Min value for a good signal: 8 µA. LAL2... Sub-base If the value is lower, it can be due to: • Worn photocell; • Low current; • Bad set up of the burner. In order to measure the current, use a microammeter of 100 µA c.c., connected to the scanner, as in the dia- gram.
BURNER FAULTS SYMBOL (1) FAULT PROBABLE CAUSE SUGGESTED REMEDY The burner does not start - A limit or safety control device is open ....Adjust or replace - Control box lock-out .
Factory Wiring Diagram RL 190/M with burner mounted Siemens LAL control D2815 Continuous fan operation Change the wire connection from terminal 7 to terminal 1, move the jumper from terminals 12-13 to terminals 4-12 and remove the wire from terminal 13 of control box.
- Power on signal depending on the burner model (see page 3). - Limit satisfied • The RL 190/M burner has been type-approved for intermittent - Manual burner stop switch operation. This means it should be stopped at least once every 24 - Terminal strip hours to enable the control box to perform self checks at start-up.
Factory Wiring Diagram RL 190/M With auxiliary panel...
Page 21
Factory Wiring Diagram RL 190/M With auxiliary panel...
Page 22
LAYOUT (A) - (B) page 20 - 21 Burners RL 190/M The flame safeguard is in an auxiliary panel. See the internal electrical systems of the auxiliary panel in order to have the complete wiring diagram. Key to Layouts (A) - (B)
Page 27
BURNER START UP REPORT Model number: Serial number: Project name: Start-up date: Installing contractor: Phone number: GAS OPERATION Gas Supply Pressure: : Low Fire High Fire Main Power Supply: : Low Fire High Fire Control Power Supply: CO: Low Fire High Fire Burner Firing Rate: : Low Fire...
Page 28
RIELLO S.p.A. I - 37045 Legnago (VR) Tel.: +39.0442.630111 http:// www.rielloburners.com RIELLO BURNERS NORTH AMERICA 1-800-4-RIELLO 35 Pond Park Road 2165 Meadowpine Blvd. Hingham, Massachusetts, 1-800-474-3556 Mississauga, Ontario, U.S.A. 02043 Canada L5N 6H6 http://www.riello-burners.com Subject to modifications...