Kit Contents; Position - B&D Smart Pro Installation Instructions Manual

Sectional door opener
Hide thumbs Also See for Smart Pro:
Table of Contents

Advertisement

Smart Pro installation instructions

4. Kit Contents

9
12
10
13
14
15
1.
1 x SDO drive unit
2.
1 x Wall mount transmitter
3.
2 x Transmitters
4.
1 x Bent arm door attachment
5.
1 x Straight arm door attachment
6.
1 x Wall bracket TS01
7.
1 x Door bracket Locator

5. Position

The Opener:
a. MUST BE installed in a dry position, protected from weather.
b. REQUIRES properly earthed 3 pin single phase power on the ceiling within an arms length of the opener.
c. Requires a MINIMUM HEADROOM of 57mm between the highest point of the door's travel and the ceiling.
d. Use the diagram below as a reference when completing the installation.
9
9
11
6
5
13
10
9
12
4
8
7
6
7
8
4
11
3
2
8.
9.
10.
11.
12.
13.
14.
3374mm
3156mm*
12
Rail no Extension Kit 3156mm
Rail + 1 Extension Kit 4146mm
Rail + 2 Extension Kits 4936mm
* Rail refers to 3160 rail
Placed on both sides of door, with
16
the beam 100mm above floor level.
5
1 x Door bracket
3 x Pin Snap SSP 8 ZNU 31080
2 x Hex Head screw M8x25
1 x Pin 0890
2 x Clevis Pin 0829
2 x Hex Serration flange nut M8
4 x Hex flange screw 'S' M4 x 10
18
MINIMUM HEAD
ROOM FOR
RAIL 57mm
1
18
15.
1 x Battery kit
16.
1 x Wireless PE Beam Kit
PLUS
17.
2 x Track Bracket
18.
1 x Track
Perforated
Angle
17
14
1
353mm
5
16
17

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Smart Pro and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Smart pro sdo-9

Table of Contents

Save PDF