Advertisement

Quick Links

Quick Start Guide
AV-BSBL
Your system will consist of: 1 x Folding Steady Burning Barrette, 2 x Stanchions (or Support Pole),
2 x 2 in. Stainless Couplings, 2 x Mounting Caps, 8 x Ground Stakes, 4 x 12 ft. Line (Single Loop),
4 x 14 in. Line (Double Loop), 4 x Cam Clips
Required Tools: Mallet (User Supplied)
Double Loop Line
with Cam Clip
Single
Loop Line

Step 1: Gather All Components

Lay all the parts on the ground in preparation for
assembly.

Step 3: Straighten the Barrette

a.
Straighten the barrette until it is fully extended.
b. Secure the two latches.
For the full manual, visit the link below:
avlite.com/product/barrette-steady-burning-light-av-bsbl/
Thank you for purchasing this product. This guide will
provide you with a brief summary of the steps involved in
deploying the Folding Steady Burning Barrette with tie-down
installation.
Folding Barrette
Mounting Cap
U-Bolt
Ground Stake

Step 2: Open Barrette Latch

a.
b. Unfold the Barrette.

Step 4: Install Mounting Cap

a.
b. Flip barrette over.
c.
d. Place (4) flat washers over U-bolts and thread (4)
e.
f.
Lift the handle of the butterfly latch to unlock.
Slide two U-bolts onto barrette between the first
and second light head.
With flat side down, align the mounting cap
holes with the U-bolt. Ensure the arrow on
mounting cap is pointing towards the lights.
hex nuts until fingertight.
Thread coupling onto mounting cap.
Repeat on other end.
Coupling
Mounting Cap
U-Bolt

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AV-BSBL and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Avlite AV-BSBL

  • Page 1 Thank you for purchasing this product. This guide will provide you with a brief summary of the steps involved in deploying the Folding Steady Burning Barrette with tie-down AV-BSBL installation. Your system will consist of: 1 x Folding Steady Burning Barrette, 2 x Stanchions (or Support Pole), 2 x 2 in.
  • Page 2 Barrette upright. d. Repeat steps on the opposite side. Repeat on opposite side of the stanchion. Repeat steps to stake other stanchion. Head Office Avlite USA Avlite Asia General Enquiries   +61 (0)3 5977 6128...
  • Page 3 Take the cam clip from the ground stake tie-down assembly, and feed the tail end of the line into the cam locking mechanism of the clip. Pull the line through the cam clip to eliminate any slack. For the full manual, visit the link below: avlite.com/product/barrette-steady-burning-light-av-bsbl/...
  • Page 4 Battery Box and which barrettes connect to the next barrette in line. b. Connect the Solar Panel cables to the Solar Panel inputs on the Battery Box. Head Office Avlite USA Avlite Asia General Enquiries   +61 (0)3 5977 6128...

Table of Contents