363-208-011, Appendix 3
Test Head Installation
Circuit Pack Verification
Step 1: Verify that the SMU, LAN, and PDC are in the ARM shelf.
Step 2: Verify that the MDC, T8U, and PTU are in the MDS shelf(ves) of the
subscriber circuits or drops to be tested.
NOTE
The T8U is required for TR-08 operation only.
Step 3: Verify that the DLC software is as follows:
COT: R 3.03.01 (or later)
:
Issue 1
November 1998
A3-9