®
SLC
-2000 Access System
COT Assembly Manual
Applications
Introduction
This section of the manual contains Application Figures and the standard
Application Schematic. These drawings facilitate the installation process and are
a means of tracing and troubleshooting installation wiring and interconnect
problems. They offer the installer both a comprehensive overview and detailed
requirements relating to all interconnections in the SLC
System.
Application Figures
These general figures are meant to guide the installer in the installation of the
Customer Interconnect Cable Assemblies and the cross-connections to the
ancillary equipment. Separate cross-connect blocks are indicated for each type of
alarm and test application (Miscellaneous, Discrete, COT, DC Test Pair, etc.) but
may be economically combined at the customer's discretion. The figures show
specific equipment (cable assemblies, cross-connect blocks, ringing supplies,
etc.) but are meant to be typical examples. Other vendor products may be
substituted but they must meet the requirements outlined by the Application
Schematic drawing, SD7C180-01.
Figures
Figure A-1
Figure A-2
Figure A-3
Figure A-4
Figure A-5
Figure A-6
Description
COT Bay Peripheral Equipment Interconnections
MDS Assembly VF Cabling Channels 1-96
MDS Assembly E&M Cabling Channels 1-96
DS1 Distribution 1-28
Lightguide Interconnect
Miscellaneous Discrete Environmental Alarms and Controls
Lucent Technologies
363-208-011
A
®
-2000 COT Frame
Issue 4 February 1997
A-1
Need help?
Do you have a question about the SLC-2000 Access System Central Office Terminal and is the answer not in the manual?
Questions and answers