Download Print this page

Troubleshooting - IMER ES 150 Operating, Maintenance, Spare Parts Manual

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 9
- Check the gearmotor oil level regularly before
operation by means of the level plug. Top up if necessary.
Oil change is scheduled for every 2000 hours of service.
Use gear oil viscosity ISO VG 460 at 40°C.
- Contaminated oil is considered special waste and must
be disposed of in accordance with provisions as specified
in the country of installation.
7.4 ELECTRICAL INSTALLATION
Ensure that the pendant control insulation is in perfect condition;
in the event of damage, only use gennine IMER spares.
8. TRANSPORT AND DECOMMISSIONING
Never leave the installed hoist unattended without first
disconnecting the power supply and rewinding the rope
completely onto the drum.
In the event of prolonged disuse, protect the hoist against
weathering.
During transport, protect machine parts from impact, damage or
crushing.

9. TROUBLESHOOTING

PROBLEM
CAUSE
- Emergency
pushbutton is
pressed
- Faulty power
supply
- Plug not inserted
correctly in socket
Machine does not
start when
- External panel
ascent or
circuit breaker has
descent buttons
tripped
are pressed
- Faulty power
cable- Loose wire
in control panel
- If problems
persist
9.1. HOIST BREAKDOWN WITH SUSPENDED LOAD
If possible, remove load via the relative access level and detach
the hoist for maintenance.
If the load cannot be removed, use other lifting equipment (of
sufficient capacity) installed above the hoist and pick up the
hoist by hooking to the part directly above the rope pull line and
also the supporting structure.
Lift the hoist slowly to detach it from the clamps and then lower
to the ground.
Do not attempt to adjust the brake adjustment nut to avoid the
loss of brake control and consequent hazards.;
Never attempt maintenance with the hoist under load conditions.
10. NOISE LEVEL AT THE OPERATOR'S EAR
The level Lp(A) given in the TECHNICAL DATA chart corresponds
to the weighted equivalent sound pressure level on scale A of
European Directive 98/37. This level is measured with no load,
at the operator's head in the working position 1.5 metres away
from the instrument, considering the different working conditions.
IMER INTERNATIONAL S.p.A.
ES 150
REMEDY
- Rotate
pushbutton to
release
- Check mains line-
Reconnect the
plug
- Reset thermal
magnetic circuit
breaker
- Replace cable
- Reconnect wire
- Contact IMER
Service Centre
- 11 -

Advertisement

loading