Download Print this page

Facnor R 80 Installation Manual page 12

Furling and reefing system

Advertisement

Available languages

Available languages

FITTING OF THE SECTIONS
1. fix a connector on the top of all standard
sections.
Do not lock the screws.
2. Put the wire into the top section
3. Insert a black bearing (Rep. B) into the
bottom of the top section
Connect both sections (the bearing will be
pushed up and locked by the connector).
Tighten the 4 screws.
4. insert a bearing (Rep. B) into the 2 M
section and connect it with another standard
section.
5. Continue
this
sections. Do not forget to insert a bearing.
You must have: a bearing always above
each connector.
6. pass the forestay through the telescopic
section and the black feeder.
7. on the last section, insert a bearing, this one
will be pushed up by the telescopic section.
8. insert the telescopic section into the bottom
section.
Do not fit the screws yet.
operation
for
the
12
next

Advertisement

loading

This manual is also suitable for:

R 130R 150R 200R 260R 290