MLT 2 / BINOS
2.1
General
Proper function of the instrument requires
proper installation.
Take care to follow all instructions given in this
chapter as well as given in the accompanying
manuals of the safety devices!
2-2
100 F
2.1 General
ATEX Instruction Manual
2.2
Installing the Intrument
Install the instrument as described in the basic
analyzer instruction manual: Pay attention to
the revised dimensions, due to the attached
pressurization equipment, as shown in figures
2-1 to 2-4.
Ensure there is enough space to install the
equipment.
Emerson Process Management GmbH & Co. OHG
ETC01035
02/2008