Nortel CallPilot 703t Installation And Configuration Manual page 233

Maintenance and diagnostics
Hide thumbs Also See for CallPilot 703t:
Table of Contents

Advertisement

October 2003
The check takes up to 2 hours to complete. You are informed when it is
finished. If any errors were found, you receive a message similar to the
following:
4 If you will not be proceeding with splitting the RAID system pack at this
time, click Configuration
Console Plus.
Result: The following message appears:
5 Click OK.
What's next?
Continue with "Splitting the RAID system pack" on page 234.
Part 5: 703t Server Maintenance and Diagnostics
Maintaining the AMI MegaRAID Elite 1600 RAID system
Exit to close MegaRAID Client Power
233

Advertisement

Table of Contents
loading

Table of Contents