6. Test system and ensure it is operating as prior to the retrofit.
a. Ensure the solar voltage (solr) is between 15-20V.
b. Run the BIST (built-in self-test) and verify there are no errors, in particular the charging error
(4000).
c. Let the system charge for a few minutes and confirm battery voltage rises under the battery (batt)
status. For 24/7 beacon systems you may need to temporarily change the input (inpt) to NO
(normally open) so the system isn't under a constant power draw
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 |
AC TO SOLAR RETROFIT GUIDE
customersupport@carmanah.com
|
carmanah.com
10