Download Print this page

OLT GS84-S Assembly Manual page 21

8x4 gardensaver garden shed single door

Advertisement

Plywood flush
with shingles
on inside.
38.
Correctly orientate Left Side Roof Panel, with shingles overhanging plywood on the side of the
shed and flush with plywood to the middle. Place on rafters with front of plywood just about flush with
rafter ends but just slightly recessed. Doing so allows front facia to sit better.
Roof Panel centered
on rafter.
39.
For correct Roof Panel position, align panel so plywood sits evenly on Center Rafters. Complete
both roof Panels.
Push tight together.
40.
With Roof Panels aligned, screw panels down to center rafters with 2 - 2 1/2" Screws in Bottom
Row of Shingles Only (1 screw per panel).
Toll Free 1-888-658-1658
Shingles overhang plywood on outside.
Nailing strip to outside edge.
www.outdoorlivingtoday.com
Screw Bottom Row of
Shingles ONLY for now.
Screw on angle away
from shingle edge to
prevent it from cracking.
Page 21
Rear of plywood
1/8" recessed
with rafter end.
Roof Seam.
sales@outdoorlivingtoday.com

Advertisement

loading