NOTE: All hangers must be installed with the cavity side facing the burner end of the system -
Except the vent end hanger - the hanger cavity side at vent end of the must face the vent.
FIGURE 22 REFLECTOR EXTENSIONS
Reflector extensions
may be installed one
or both sides
1. Reflector extensions may be installed on
one side or both sides of the reflector
2. Reflector extensions are 116" (295 cm)
long
3. Holes (3) for "S" hooks are located
2.25" (5.7 cm) from each end and one at
the center of the reflector extension
4. Drill 1/4" (7 mm) holes in the reflector
3/4" (2 cm) up from the bottom edge of
the reflector to align with the 3 holes in
the top of the reflector extension
5. Insert "S" hook down through hole in the top of the reflector extension
6. Rotate "S" hook approx. 90°, and insert into hole in reflector
7. Settle reflector extension into place
(OPTIONAL - IF REQUIRED )
Insert 'S' hook
from top and
rotate
39
STS-JZ-F / IQ-F I&O Manual Z83.20-2016
IM101220
RD: APR 2019
RL: 20C