Page 1
INSTALLATION / OWNER’S MANUAL SCHWANK GAS-FIRED INFRA-RED CONSTRUCTION HEATER MODEL NUMBER: SCH-200-N / SCH-200-L CAUTION: Read all instructions before use. Retain this manual for further reference. SP-MCH2-BX-07A SCH-200 MANUAL R.D: Sept 2004 RL: 7...
Page 2
NOTICE: Schwank Inc., reserves the right to make changes to equipment and specifications without obligation or notification. All codes are current at the time of printing. This publication, or parts thereof, may not be re- produced in any form, without prior written consent from Schwank Inc.
Page 5
For Your Information and Safety … Please read the following warning labels. WARNING WARNING FOR YOUR SAFETY Failure to comply with the precautions and instructions provided with this heater can result in • death, serious bodily injury and property loss, DO NOT store or use gasoline or other damage from hazards of fire explosion, burn, flammable vapors and liquids in the vicinity of...
Page 6
WARNING • • DO NOT use heater in living or office areas. DO NOT store or use gasoline or other • flammable vapors or liquids in the vicinity of this Approved for heating buildings or structures or any other appliance. under construction, alteration or repair.
( From Radiant (From Radiant MODEL the heater regulator must in no case be lower than 6 Surface) Surface) inches of water column. SCH-200-N 52” 48” Note: The regulator is an internal component of the SCH-200-L 52” 48” heater and maintains the heater’s manifold pressure;...
1.5 MOUNTING INSTRUCTIONS FIGURE 1: FREE STANDING FLOOR MOUNT A steel rod, non-combustible base is an integral part of this heater. The heater may safely be placed directly on a combustible surface. Always maintain minimum distance to combustibles as shown in Table 2.
1.6 LIGHTING / SHUTDOWN INSTRUCTIONS 1. Set thermostat to “coolest” (lowest) setting. 2. Pre-purge gas line prior to lighting. 3. Open the door in the compartment above filter section. 4. Turn gas control knob clockwise to OFF. Wait five minutes to dissipate any unburned gas. Sniff around the appliance near the floor.
Page 10
Replace filter at least: FILTER RETAINER - once every 2 weeks - minimum once a day when sanding drywall - each time when connecting heater at different location * Clean burner screen with each filter change; ( see next window ) FILTER Filter replacement: - Shut off gas supply...
3.0 REPLACEMENT PARTS TABLE 3: REPLACEMENT PARTS LIST (REFERENCE PAGE 10) ITEM NO. PART NAME SCH-200-NG SCH-200-LP SHROUD JH-0614-BK JH-0614-BK SHROUD JH-0614-FR JH-0614-FR TOP RING ASSEMBLY JH-0612-TR JH-0612-TR BOTTOM RING ASSEMBLY JH-0612-BR JH-0612-BR LEG ASSEMBLY JH-0612-LG JH-0612-LG MANTLE JH-0533-XX JH-0533-XX VENTURI ASSY JH-0619-XX JH-0619-XX...
Page 13
4.0 GAS-FIRED INFRA-RED PORTABLE HEATER LIMITED WARRANTY WHAT IS COVERED PROCEDURE Schwank Inc. (Manufacturer) warrants that this heating Should you desire to assert a warranty claim, you product is free from defects in material or workmanship must use the procedure described in your owner’s...
Tag” which is provided to all distributors. terms.) CUSTOMER’S RECORD Keep for your records. Record the information concerning your new Schwank gas-fired infra-red construction heater. The model number and the serial number will be found on the rating plate. Date of Purchase: Schwank Model No.:...
Page 15
This warranty gives you specific legal rights. You may also have other rights which vary by each jurisdiction. SP-DCHX-BX-02A SCH series WARRANTY May 2004 SCHWANK INC. 5285 BRADCO BLVD. MISSISSAUGA, ON, L4W 2A6 Ph: 905-712-4766 RL: 2 SP-MCH2-BX-07A SCH-200 MANUAL R.D: Sept 2004...