Schwank STS-JZ Installation & Owner's Manual page 27

Low intensity tube type infra red heaters
Table of Contents

Advertisement

6 Please NOTE that each hanger has a 'flat' side and a 'cavity' side – FIGURE 6
a) Starting at the burner end of the heater: all hangers (except the last plate hanger) are
oriented with the cavity side of the hanger facing toward the burner end
b) Only the cavity side of the vent end plate hanger faces the vent - FIGURE 6
Refer to Figures on next pages, then proceed to Section 9. Burner and Tube Installation
FIGURE 9 END PLATE & WEBBED HANGERS
Use solid End Plate Hanger
at Burner and Vent ends
FIGURE 10 TYPICAL HANGER & SUPPORT SPACING
8.5" (21.6 cm)
Angle the burner suspension
chain back over the burner to
allow system expansion
(note cavity side faces
outward from tube)
4.5" (21.6 cm) IMPORTANT
116" (295 cm)
10
The distance between the
tube flange and face of
the plate hanger must be
4.5" (11.4 cm)
Intermediate Webbed
Hanger (note: cavity side
always faces Burner).
116" (295 cm)
1. Burner Assembly
2. Flange Adapter
3. Flanged Tube
4. Swaged Tube
5. Vent termination
6. End Plate Hanger
7. Webbed Hanger
8. Hanging Chains
9. Focus Shield Reflector
10. Reflector Stabilizer
27
IMPORTANT
10
(optional; wall or roof)
STS-JZ-F / IQ-F I&O Manual Z83.20-2016
RD: APR 2019
IM101220
RL: 20C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents