Fold Down Guardrails; Fold Down Procedure; Erection Procedure - Snorkel SL30SL Operator's Manual

Hide thumbs Also See for SL30SL:
Table of Contents

Advertisement

Operation

FOLD DOWN GUARDRAILS

This procedure applies only to the SL26-30 Speed Level model for the purpose of Transportation.
Guardrails must be returned to proper position before using the machine.

FOLD DOWN PROCEDURE

1. Retract Extension Platform by releasing Securing Pins and sliding Extension Platform into locking position.
2. Unhook the controller from the side guardrail and place it on the floor of the platform.
3. Starting at the front of the platform, remove nuts, bolts and washers from the top of the front guardrail. Fold
the front guardrail down onto the platform.
4. Close and latch gate.
5. Remove nuts, bolts and washers from the top of the rear guardrail. Fold the rear guardrail down onto the
platform being careful to keep latched at all times.
6. Remove nuts, bolts and washers from the top of the side guardrails. Lift up and fold one side guardrail in so it
rests on the deck. Repeat with other side guardrails.

ERECTION PROCEDURE

1. Raise side guardrails, making sure each is pushed down to secure the guardrail in the vertical position.
2. Install bolts, washers and nuts between the side guardrails, tighten securely.
3. Raise rear guardrail assembly, aligning holes and install bolts, washers and nuts. Tighten securely.
D A N G E R
Before entering platform, guardrails must be
securely fastened in their proper position.
LH EXT. PLATFORM
HANDLE
Operation Manual
DO NOT use the work platform without
guardrails properly assembled and in
place
RH EXT. PLATFORM
HANDLE
W A R N I N G
Page 11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl26sl51000

Table of Contents