Summary of Contents for Crane BARNES 3SE-HD Series
Page 1
Read all instructions in this manual before operating pump. As a result of Crane Pumps & Systems, Inc., constant product improvement program, product changes may occur. As such Crane Pumps & Systems reserves the right to change product without prior written notifi cation.
Page 2
♦ Retaining Ring Other brand and product names are trademarks or registered trademarks of their respective holders. ® Barnes is a registered trademark of Crane Pumps & Systems, Inc 1999, 2002, 11/03, 6/05, 4/06 , 9/06, 2/07 Alteration Rights Reserved...
Page 3
WARNING! - DO NOT pump hazardous materials IMPORTANT! - Crane Pumps & Systems, Inc. is not (fl ammable, caustic, etc.) unless the pump is specifi cally responsible for losses, injury, or death resulting from a designed and designated to handle them.
Page 4
SECTION: SERVICE AND REPAIR PRESSURE GAUGE ç10 PSI ASSEMBLY 1) Lubrication: Anytime the pump is removed from operation, the cooling oil REMOVE PIPE in the motor housing should be checked visually for oil level PLUG and contamination. 1.1) Checking Oil: Motor Housing - To check oil, set unit upright.
Page 5
and torque to 40 ft. lbs. Rotate impeller to check for binding. TABLE 1 - COOLING OIL - Dielectric Position o-ring on volute fl ange and position impeller and SUPPLIER GRADE motor housing assembly over studs and onto volute. Apply Sohio / Standard SE 40, Energol HL22 or HL32 thread locking compound to each stud.
Page 6
Important! - Handle seal parts with extreme care. Important ! - It is EXTREMELY important to keep Do Not scratch or mar lapped surfaces. seal faces clean during assembly. Dirt particles lodged between these faces WILL cause the seal Seal - Remove rotating member, spring and retaining ring to leak.
Page 7
SINGLE PHASE, 230 VOLT AC Power Cable (10a) Motor Lead Number Green (Ground) Green CAPACITOR Black White TERMINAL BLOCK Flag Terminal Capacitor Flag Terminal Capacitor CAPACITOR MOTOR LEADS MOTOR LEADS SINGLE PHASE - 230 VOLT AC THREE PHASE, 200/230 VOLT AC Power Cable (10A) Motor Lead Number Green (Ground)
Page 8
3.4) Conduit Box and Cord Assembly: Conduit Box Design: Refi ll with cooling oil as outlined in paragraph 1.4. Position conduit box and square ring over opening. Place lockwashers on cap screws, apply Loctite to cap screws threads and torque to 16 ft lbs. Remove gland nuts, friction rings, and grommets from conduit box inspect and replace if required.
Page 9
Limited 24 Month Warranty Crane Pumps & Systems warrants that products of our manufacture will be free of defects in material and workmanship under normal use and service for twenty-four (24) months after manufacture date, when installed and maintained in accordance with our instructions.This warranty gives you specifi c legal rights, and there may also be other rights which vary from state to state.
Page 10
Crane Pumps & Systems, Inc. Distributor. RETURNED GOODS RETURN OF MERCHANDISE REQUIRES A “RETURNED GOODS AUTHORIZATION”. CONTACT YOUR LOCAL CRANE PUMPS & SYSTEMS, INC. DISTRIBUTOR. Products Returned Must Be Cleaned, Sanitized, Or Decontaminated As Necessary Prior To Shipment, To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material.
Need help?
Do you have a question about the BARNES 3SE-HD Series and is the answer not in the manual?
Questions and answers