Grounding - EBARA DL3FU Operating Instructions, Installation & Maintenance Manual

Submersible wastewater, sewage pump
Table of Contents

Advertisement

EBARA Submersible Sewage Pumps
DL3FU / DL3MFU / DL3KFU / DL3KMFU / DDL3FU / DV3FU/ DML3FU
Operating, Installation, and Maintenance
INSTRUCTION MANUAL
Output 40 to 60HP
460V(208/230V not available)
G
L2
S
L1
R
L3
T
P1
P2
THERMAL PROTECTOR
P3
P4
LEAKAGE DETECTOR
4.2 Grounding (Fig. 11 and Table 3)
Be sure to connect the ground line (labeled "G") to ground. Prior to grounding, ensure that the
wire is the proper one (labeled "G").
Also, verify that grounding continuity has been established inside the motor by checking that
ground wire (labeled "G") is electrically conductive with the bolt on the top of the motor (to be
stripped of paint to bare metal surface).
Ground the motor according to local codes.
EBARA
PUMPS AMERICAS CORPORATION
PM32U
www.pumpsebara.com
(t) 803.327.5005 (f) 803.327.5097
T4
T2
T1
T6
T3
Ground wire
Ground
plate
Table 3 (Example)
Motor

Grounding

classification
resistance
AC 600V below
G - GRN
L1 - RED - T1- T6
L2 - WHT - T2 - T4
L3 - BLK - T3 - T5
P1 - RED
P2 - WHT
P3 - BLK
P4 - ORG
T5
G.L
Ground terminal
Fig. 11
Minimum Ground
line diameter per
10Ω
NEC 70
P.15
16
rev. 01/21

Advertisement

Table of Contents
loading

Table of Contents