EBARA DL3FU Operating Instructions, Installation & Maintenance Manual page 32

Submersible wastewater, sewage pump
Table of Contents

Advertisement

Corporate Headquarters
1651 Cedar Line Drive, Rock Hill, South Carolina 29730 USA
P: (803) 327-5005 F: (803) 327-5097 www.pumpsebara.com
EBARA INTERNATIONAL CORPORATION WITHIN 30 DAYS OF START-UP
Date:
________________________________ Job Name: ______________________________
Contractor: ____________________________ Signature: ______________________________
Design Conditions: ______________________ GPM @: ______________________________TDH
Pump Model: ____________________ HP: ______ Voltage:
Pump Serial No.: #1 __________________ #2 __________________ #3__________________
Control Manufacture: ____________________ Heater Size: ____________________________
GRD Connected: ________________________ Alternator Tested__________________________
Megger Check:
#1________ Red ________
#2________ Red ________
#3________ Red ________
Resistance Check: #1________ RW ________
#2________ RW ________
#3________ RW ________
Amperage Check:
#1________ A __________
#2________ A __________
#3________ A __________
Performance Test: #1________ GPM@ ____
#2________ GPM@ ____
#3________ GPM@ ____
1. Check oil
2. Sensor cable connected
3. Check moisture sensor
4. Check thermal sensor
5. Check rotation
6. Guide Rails
Plumb
7. Station clean of debris
Comments ________________________________________________________________________
__________________________________________________________________________________
I certify this report to be accurate ( please sign): ____________________________________________
Official Start Date: ________________________ Report Date: ______________________________
Pumps Americas Corporation
PUMP START-UP REPORT
WARRANTY VOID IF NOT COMPLETED AND MAILED TO
yes
no
closed
open
closed
open
Secured
please
voltage below:
208/230
460
White ________
Black________
White ________
Black________ { To Ground
White ________
Black________
RB __________
WB ________
RB __________
WB ________ { Rated ______
RB __________
WB ________
B____________
C __________
B____________
C __________ {FL Amps ____
B____________
C __________
TDH ________
TDH ________
Water Level ________
TDH ________
8. Check valves for proper operation
9. Pump seated properly
10. Check for leaks in piping
11. Flow meter
12. Pressure gauge
13. Ebara Capacitor pack or equivalent (1ø only)
AB
AC
BC
_____ _____ _____
Relay # __________
Start Cap MFD __________
Run Cap MFD __________
rev. 01/21
32

Advertisement

Table of Contents
loading

Table of Contents