Abbreviations

Abbreviations used in this manual are listed below.
Abbreviation
Description
Cat.
Category. Classification of the safety-related parts of a control system
in respect of their resistance to faults and their subsequent behavior
in the fault condition, and which is achieved by the structural
arrangement of the parts, fault detection and/or by their reliability.
The categories are: B, 1, 2, 3 and 4.
HFT
Hardware fault tolerance
IGBT
Insulated gate bipolar transistor
PL
Performance level (levels are: a, b, c, d and e). Corresponds to SIL.
POUS
Prevention of unexpected start-up
SIL
Safety integrity level
STO
Safe torque off

Exclusion of liability

ABB is not responsible for the implementation, verification and validation of the overall
safety system. It is the responsibility of the system integrator (or other party) who is
responsible for the overall system and system safety.
The system integrator (or other responsible party) must make sure that the entire
implementation complies with all relevant standards, directives and local electrical code,
and that the system is tested, verified and validated correctly.

Quick reference guide for implementing a safety system

Task
Select the appropriate functional safety standard for the implementation: EN ISO 13849-1,
EN/IEC 62061, IEC 61511 or other.
If you select EN/IEC 62061 or IEC 61511, make a safety plan. See EN/IEC 62061 or IEC 61511.
Assess safety: analyze and evaluate risks (estimate SIL/PL) and define risk reduction strategies.
Define the safety requirements.
Design the safety system. The part of the design made by ABB is described in chapter
description and instructions
Verify the achieved SIL/PL with, for example, FSDT-01 Functional safety design tool or similar. See
Functional safety design tool user's manual (3AXD10000102417 [English]).
Connect the wiring. See section
Set the parameters. See section
Validate that the implemented system meets the safety requirements:
• Do the acceptance test. See section
Write the necessary documentation.
on page 11.
Wiring
on page 15.
Parameter settings
Start-up and acceptance test
Introduction to the manual 9
on page 14.
on page 16.
Reference
EN ISO 13849-1
IEC 61508,
EN/IEC 62061
EN ISO 13849-1
EN 1037
IEC 61508,
IEC 61511,
EN/IEC 62061,
EN/IEC 61800-5-2
EN/IEC 61800-5-2
Option