Initial Operation Of Equipment - ID Technology 252 Operator / Technical Manual

Table of Contents

Advertisement

READ BEFORE OPERATING EQUIPMENT
1. Introduction
All operating and maintenance personnel must read this manual carefully and pay
special attention to the warnings and cautions before operating or servicing the
machinery.

2. Initial Operation of Equipment

ID Technology equipment is carefully assembled and checked before it is shipped
from the factory. Upon completion of field installation all fasteners, set screws, etc.
should be checked for tightness. After an initial operating period of 40 to 60 hours,
the equipment should again be thoroughly inspected for any signs of loose fasteners,
set screws or other components and necessary corrections made.
CAUTION
2
Model 252
Label Printer/Applicator
Operators/Technical Manual

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for ID Technology 252

Table of Contents