User Unit Installation; Foundation Preparation - Siemens VersiCharge Ultra 175 Site Installation Manual

175 kw fast charger
Hide thumbs Also See for VersiCharge Ultra 175:
Table of Contents

Advertisement

4.7

User unit installation

4.7.1

Foundation preparation

Note: If the user unit is to be located a distance greater than
100m from the IPU, optical fiber is required for communication
in place of Cat 6A.
Foundation design and preparation is the responsibility of the
customer. Device footprints are provided by Siemens for hole
drilling and conduit / cable location guidance. For further
details, please refer to VersiCharge 175 kW Fast Charger User
Unit Installation Manual.
Note: A mounting stencil may be supplied by Siemens at
customer request.
Figure 14: User Unit Baseplate Dimensions
Site Installation Manual
| VersiCharge Ultra 175™ kW Fast Charger
19