INSTALLATION

Entry Clearance

Crated: 47" (1194mm)
Uncrated: 32-1/2" (826mm)

Installation Clearance

NOTE: Always provide adequate clearance for maintenance
and operation.
Installation adjacent to combustible and non-
combustible wall, minimum clearance:
Left Side
Single-Deck
1" (26 mm)
Double-Deck 1" (26 mm)
Installation near high heat producing equipment,
minimum clearance:
Left Side
Single-Deck
1" (26 mm) 6" (153 mm) 3" (77 mm)
Double-Deck 1" (26 mm) 6" (153 mm) 3" (77 mm)
Avoid installing ovens near equipment, such as char-
broilers or fryers, which generate high heat and high
grease laden air.
Clearance for Service (recommendation):
Single-Deck
Double-Deck
NOTE: Install units with casters in very tight
locations for ease of service.
IMPORTANT Large objects should not be placed in front
of this oven, which would obstruct the airflow through the
front. Objects should not be placed on the main top rear
of the oven while in use because this could obstruct the
venting system. Install ovens where side body perforated
panels or control sections do not get sprayed with water
wash down spray hoses.
8
Control Side
Rear
1" (26 mm)
3" (77 mm)
2" (51 mm)
3" (77 mm)
Control Side
Rear

Notice
Control Side, minimum
12" (305 mm)
12" (305 mm)
Installation of Ovens Equipped with Casters
A. For an appliance equipped with casters, the installation
shall be made with a connector that complies with the
Standard for Connectors for Movable Appliances, ANSI
Z21.69. Adequate means must be provided to limit the
movement of the appliance without depending on the
connector wiring.
B. The front casters of the unit are equipped with brakes to
limit the movement of the oven without depending on
the connector wiring to limit the appliance movement.
C. A restraint can be attached to the unit. If the restraint is
disconnected, be sure to reconnect the restraint after the
oven has been returned to its originally installed position.

Installation of Double Deck Models

A. Position insert in bottom leg opening and tap insert up
into leg until it seats at collar. Attach six inch (6") legs to
lower oven section. Raise unit or lay on its left side. Place
the front legs on the oven so as to line up with four (4)
attaching bolt holes. Secure leg to oven frame using (4)
3/8-16 x 3/4 bolts and washers provided. Repeat at rear of
unit.
B. Remove lower front cover of top deck (located under
oven doors). Raise top deck into place and line up body
sides and back of the unit. Fasten the rear of the units
together, with the stacking bracket using (6) 1/4-20
machine screws, lock washers and nuts, (provided).
C. Install the interconnecting flue parts, carefully following
the instructions contained in the stacking kit. Pay
particular attention to the type of ovens you are stacking
and be sure to follow the corresponding instructions.
D. Check leveling of unit four (4) ways (using a common
carpenter's level on the rack inside the oven).
E. Maintain clearance from combustibles.
CAUTION: Disconnect both ovens from electrical supply
before servicing to protect against shock!
Document # G_EO_OM_CONVECTION_4605649 – 11/20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Master mco-ed-10sMaster mco-es-20sMaster mco-ed-20sMaster mco-es-10mMaster mco-ed-10mMaster mco-es-20m ... Show all

Table of Contents