V.ORLANDI E 50 Installation, Operating And Maintenance Instructions page 56

Drawbar coupling
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
5.4 REPLACEMENT OF THE COUPLING JAW
ATTENTION: Make sure that the coupling is closed, ie. the coupling pin
(14) is down.
1)
Remove the 4 screws (21) keeping the washers, remove the mechanism unit
(20a) and the coupling pin (14);
Remove the 3 screws (12d), plate (12c), spring (12b) and circlip (26b);
2)
3)
Move the jaw (13) downwards and remove it (see chapter 7 DISPOSAL, page
30/32);
Place the new jaw (13) in to position, fit the circlip (26b), spring (12b) and plate
4)
(12c);
5)
Tighten the screws (12d) to torque M = 50 Nm using Loctite 243;
6)
Fit the coupling pin (14) and the mechanism unit (20a) (see point 3 in chapter
5.2 REPLACEMENT OF THE MECHANISM UNIT AND THE COUPLING PIN, page
22/32).
DRAWBAR COUPLING E 50
20a
14
26b
12b
12c
12d
PAG.
24/32
CHAP . 5
REV. F
13

Advertisement

Chapters

Table of Contents
loading

Table of Contents