V.ORLANDI E 50 Installation, Operating And Maintenance Instructions page 52

Drawbar coupling
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
4)
Checking the vertical play of the coupling pin:
Check that the vertical play of the coupling pin (14) is no more than 4 mm. The
play "S" is to be measured by pushing the tip of the pin upwards when the
operating handle (22A-22B) is down (see figure on page 19/32).
In case the play exceeds the limit replace the lift lever (15) (see chapter 5.3
REPLACEMENT OF THE LIFT LEVER SPRINGS, page 23/32);
5)
Checking for play in the operating handle:
Check that the free movement of the operating handle (22A-22B) is less
than 10° (degrees) as shown in the figure. In case the limit is exceeded
replace the operating handle (22A-22B) and the lift lever (15) (see
chapter 5.3 REPLACEMENT OF THE LIFT LEVER SPRINGS, page 23/32);
6)
Checking the torque of the screws and bolts:
Check that the torque of the screws (21) is M = 50 Nm and that the torque
of the fixing bolts (24) is as given in point 1 in chapter 2 INSTALLATION on
page 10/32;
7)
Lubrication:
Grease the mechanism unit (20a) through the grease nipple (29) on the right
side of the mechanism box (see the figure on page 17/32).
Always grease the mechanism with the coupling pin (14) raised (see point 1 in
chapter 3.1. COUPLING UP on page 12/32). Do not over grease.
N
Too much grease can hinder good functioning of the mechanism.
O
Oil the moving parts of the trailer coupling.
T
E
DRAWBAR COUPLING E 50
24
10°
22A 22B
21
PAG.
20/32
CHAP . 4
REV. F

Advertisement

Chapters

Table of Contents
loading

Table of Contents