Operation - Bartscher Deli-Cool PRO 2/1 GN Instruction Manual

Cold counter
Table of Contents

Advertisement

Available languages
  • EN

Available languages

Connection
Prior to first use, let the device stand still for at least 2 hours before you connect it to
the power supply.
After power failure or unplugging the device, wait 5 minutes before you connect it to
the power supply.
The power socket circuit must be protected with at least 16A fuse. Connect the
device directly to wall outlet, power strips or multiple sockets shall not be used.
Place the device so that the plug is accessible. Thus, the unit can be quickly
disconnected from the mains when needed.

5.3 Operation

Before the first use
Clean the device after unpacking and before the connection according to the
instructions in section 6.2 "Cleaning".
Clean the GN containers before use.
Digital temperature controller
Setting buttons and indicator lights
Temperature increase button
LED cooling indicator
LED defrost indicator
Button with LED lighting
SET-control/save button
Digital display
Temperature decrease button
- 27 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

405056

Table of Contents