Operations - J&M Torsion Flex Manual

Soil conditioner
Table of Contents

Advertisement

Operations

PREPARING THE TORSION-FLEX SOIL CONDITIONER
Before putting the soil conditioner into operation, check the machine for damaged or worn parts and replace as necessary.
Hardware
Make sure all hardware is properly fastened according to the Bolt Torque chart found in this manual. Recheck all hardware for
tightness after the unit has been operated for several hours. Check all pins and retaining rings are in good condition. Replace any
pins of retaining rings that are worn, damaged or missing.
Hydraulic Hoses
Check all the hydraulic hoses to make sure they are not rubbing against sharp edges or are kinked or twisted. Hoses should be
secured to the soil conditioner with nylon tie straps. Check hoses and fitting for hydraulic leaks. Tighten or replace as necessary.
Lubrication
Lubricate the Torsion-Flex soil conditioner according to the "Service" on page 17.
Tires and Wheels
Check the tire pressure in the transport tires. The recommended air pressure is 46 PSI. Make sure the tire pressure is equal in all
tires. Make sure the wheel lug nuts are tightened to 80 Ft. Lbs. Check the wheel lug nuts before initial operation and after the unit
has been operated for several hours to ensure the lug nuts remain tight.
Adjusting the Inner Tongue
Before attaching the Torsion-Flex soil conditioner to your primary tillage tool, extend the inner tongue of the A-Frame Tongue
Assembly to ensure adequate turning clearance between the implements when turning. Adjust the Inner Tongue length by
removing the 1" x 8" Tongue Pin and Cotter Pin. Readjust the Inner Tongue to the appropriate setting and re-pin as before.
Attaching to the Primary Tillage Tool
Back the primary tillage tool into position and attach the soil conditioner to the implement using a high quality hitch pin and
clip and lock into place. Install a transport chain. Transport chain should have a minimum rating equal to the gross weight of
implement and all attachments. Use only ASABE approved chains. If the unit is parked in the transport position, turn the handle
on the jack stand after the soil conditioner has been connected to the primary tillage tool to remove pressure. Remove the Jack
Assembly from the storage position and re-pin to the transport position located on top of the Storage Extension Arm.
Unfolding the Wings / Removing the Transport Locks
It is recommended to unfold the side wings in the field. Remove the wheel lift cylinder transport locks so the unit may be lowered
to the field working position. Pin the transport locks on the back of the A-Frame Tongue Assembly for easy storage.
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tf2Tf212Tf15

Table of Contents