Part 7 Trial Operation And Field Settings - Daikin FTX-N Series Service Manual

Inverter pair; wall mounted type
Hide thumbs Also See for FTX-N Series:
Table of Contents

Advertisement

1. Pump Down Operation............................................................................106
2. Forced Cooling Operation .......................................................................107
3. Trial Operation ........................................................................................108
4. Field Settings ..........................................................................................109
5. Silicone Grease on Power Transistor/Diode Bridge................................113
105
Trial Operation and
4.1 Model Type Setting .................................................................................. 109
4.2 Temperature Display Switch .................................................................... 109
4.3 When 2 Units are Installed in 1 Room...................................................... 110
Field Settings
Trial Operation and Field Settings
SiUS041638EA
Part 7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents