•
The information in this document is subject to change due to version upgrade or
other reasons. Every effort has been made in the preparation of this document
to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind,
express or implied. You can download this document by scanning the QR code.
•
Operation personnel should understand the composition and working principles
of the grid-tied PV power system and local regulations.
•
Before installing the device, closely read the user manual to get familiar with product
information and safety precautions. Huawei shall not be liable for any consequence caused by
violation of the storage, installation, and operation regulations specified in this document and
the user manual.
•
Use insulated tools when installing the device. For personal safety, wear proper personal
protective equipment (PPE).
1
Overview
(1) LED indicators (RUN, ALM)
(3) Guide rail clamp
(5) DI ports (DI)
(7) AI ports (AI)
(9) Protective ground point
(11) 24 V input power port (DC IN 24V, 0.8A)
(13) RST button (RST)
(2) Mounting ear
(4) COM ports (COM1, COM2, COM3)
(6) 12 V output power port (12V/GND)
(8) Potential transformer (PT) ports (PT1, PT2)
(10) 12 V input power port (DC IN 12V, 1A)
(12) GE ports (GE1, GE2, GE3, GE4)
Copyright © Huawei Technologies Co., Ltd. 2020.
1
All rights reserved.
Need help?
Do you have a question about the SmartModule1000A01 and is the answer not in the manual?
Questions and answers