Preparation For Threading - Texi Tegra 4 User Manual

Overlock & safety stitch
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 72

PREPARATION FOR THREADING

1.
Put the spool holder on the spool pin.
2.
While using large cone spool use spool holders which are located in the
accosory box.
3.
Put the thread spool on the spool holder.
Texi Tegra 4 INSTRUKCJA 2019.indb 79
Texi Tegra 4 INSTRUKCJA 2019.indb 79
Pull up thread guide pole to the highest
point. Place thread spools on pins and
draw thread through thread guides on
the pole from rear to front.
For large cone spools use the rubber
spool holders with the wide end at the
top, and for small ones, use the same
rubber spool holders but with the narrow
end at the top.
Spool
Spool pin
holder
Spool disk
Texi Tegra 4
EN
79
18.09.2020 09:42
18.09.2020 09:42

Advertisement

Table of Contents
loading

Table of Contents