Installing The Virtual Services Platform 4000 In An Equipment Rack - Extreme Networks ExtremeSwitching Virtual Services Platform 4850GTS Series Installation Manual

Table of Contents

Advertisement

Installing the VSP 4000 4850GTS Series
3. Set the switch on a table or shelf as illustrated below. Allow at least 2 inches (5.1
centimeters) on each side for proper ventilation and at least 5 inches (12.7 centimeters) at
the back for power cord clearance.
Installing the Virtual Services Platform 4000 in an
equipment rack
To install an VSP 4000 switch in an equipment rack, perform this procedure.
August 2018
Installing Virtual Services Platform 4850GTS Series
24

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ExtremeSwitching Virtual Services Platform 4850GTS Series and is the answer not in the manual?

This manual is also suitable for:

Extremeswitching virtual services platform 4850gts-pwr+Extremeswitching virtual services platform 4850gts dcEc4800a78-e6Ec4800a88-e6Ec4800078-e6

Table of Contents