Chapter 4 Procedures Before Operation - Mitsubishi Electric MELSEC iQ-R Series User Manual

Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
System configuration
Configure the CC-Link system and set the parameters which are required for start-up, the station number for the slave station,
and the transmission speed.
• Wiring ( Page 32 WIRING)
• Parameter settings ( MELSEC iQ-R CC-Link System Master/Local Module User's Manual (Application))
• Slave station number and transmission speed settings ( manual for slave station being used)
2.
Check operation using LED
Turn on the power and check whether the data link is being implemented properly.
If the data link is implemented properly, the LED On status will be as follows.
• L RUN LED: On
• ERR. LED: Off
3.
Programming
Program is created. For details, refer to the following.
 MELSEC iQ-R CC-Link System Master/Local Module User's Manual (Application)
4 PROCEDURES BEFORE OPERATION
4
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rj61bt11

Table of Contents