CHAPTER 2 INSTALLATION

2-1 PRE-Installation

2-1-1 Overview

This section provides the information required to plan and prepare for the installation of
a LOGIQ A1. Included are descriptions of the facility and electrical needs to be met by
the purchaser of the unit.

2-1-2 Power line Requirements

Check the following wire's parameters a week before installation. It is better to use
Drantez Model 605-3 power cord monitor with 101 options.
Parameter
Power requirement
Power consumption
Power supply frequency
Power supply twinkling change
Attenuation surge

2-1-3 Physical Specification

The weight of LOGIQ A1 is about 10Kg
Working Condition
LOGIQ A1 BASIC SERVICE MANUAL
Rating
AC 220V±22V
No greater then 130VA
50Hz
Less than 25% of regular peak value, less
than1ms of any instant-change status,
including frequency synchronization
asynchronism or non-seasonal status's
change.
Less than 15% of peak value voltage, less
than 1ms.
11
5176463-100