Cleaning The Product; Removal From Piping; Disposal; Returns - GEM 710 Operating Instructions Manual

Pneumatically operated ball valve
Table of Contents

Advertisement

15.3 Replacing the actuator
▶ The actuator can only be removed if the mounting kit is
also removed.
17
18
19
21
20
22
23
4
3
1. Unscrew the bolts 22.
2. Remove the actuator and cover of mounting kit 17 from
the body and base of mounting kit 23.
3. Remove the bolts 18 to remove the cover of mounting kit
17 from the actuator and use the bolts 18 to mount it onto
the replacement actuator.
4. Place the replacement actuator plus the cover of mount-
ing kit 17 onto the base of mounting kit 23 and bolt to-
gether with the bolts 22.
ð Remove the base of mounting kit 23 plus the bolts 21
and spindle adapter 19 of spindle 4 from the body if no
other motorized actuator is to be fitted.

15.4 Cleaning the product

Cleaning agent
▶ Damage to the GEMÜ product.
The plant operator is responsible for selecting the clean-
ing material and performing the procedure.
Clean the product with a damp cloth.
Do not clean the product with a high pressure cleaning
device.
www.gemu-group.com
NOTICE
22
CAUTION

16 Removal from piping

1. Remove the clamp or screw connections in reverse order
to installation.
2. Remove welded or solvent cemented connections using a
suitable cutting tool.
3. Observe the safety information and accident prevention
regulations.

17 Disposal

1. Pay attention to adhered residual material and gas diffu-
sion from penetrated media.
2. Dispose of all parts in accordance with the disposal regu-
lations/environmental protection laws.

18 Returns

Legal regulations for the protection of the environment and
personnel require that the completed and signed return deliv-
ery note is included with the dispatch documents. Returned
goods can be processed only when this note is completed. If
no return delivery note is included with the product, GEMÜ
cannot process credits or repair work but will dispose of the
goods at the operator's expense.
1. Clean the product.
2. Request a return delivery note from GEMÜ.
3. Complete the return delivery note.
4. Send the product with a completed return delivery note to
GEMÜ.
39 / 44
18 Returns
GEMÜ 710

Advertisement

Table of Contents
loading

Table of Contents