Positioning; Adjustments - OBL PRO Series Use And Maintenance Manual

Table of Contents

Advertisement

3

POSITIONING

The Black Line 2.0 M and R pumps can be installed on a KIT-PRO, as shown in Figure 1.
Moreover, the orientation of
pump. To carry out this operation, you just have to:
1. unscrew the 2 screws (M6x18)
2. rotate the pump
3. tighten the 2 screws (M6x18)
4

ADJUSTMENTS

See chapter 5 "USE AND SOFTWARE".
File: UT-5601
Copyright © - OBL Metering pumps - All rights reserved
Figure 1 Installation of the KIT
KIT-PRO / KIT-PRO UL
can be changed from 0 to 90° compared to the
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kit-proKit-pro ul

Table of Contents