TUONO V4 R a-PRC ABS
Flywheel cover installation
•
Insert the centring dowels in the cover.
•
Apply a layer of sealing paste along the
external edge of the cover.
•
Insert the cover together with the sta-
tor.
Recommended products
Three bond Sealing paste
-
•
Turn the five screws (1) and the two
screws (2).
•
Tighten the screws working in stages
and diagonally.
•
Insert the Blow-by system pipe and
fasten it with a new clamp.
Engine
ENG - 277