Assembly; Assembly Elastomer Bearing Bb 10 - 200 Kg - Siemens SIWAREX R Construction Elastomer Bearing Instruction Manual

Mounting units for bb series
Table of Contents

Advertisement

Revision 11/12
2.2

Assembly

The conditions for installation are very different. The load platform can be very low or
relatively high. It could be a container, a platform or a conveyor for example. The
following assembly instructions can only be taken as general guidelines.
WARNING
Proper tools are to be used for lifting the load platform. Ensure that the respective
safety regulations are followed.
The load platform should always be built on dummies to begin with, so that the load cells
are protected from damages during assembly. The load platform must then only be lifted
a few millimeters from bracket to bracket to position the elastomer bearing. The following
description of assembly procedures is based on this situation.

2.2.1 Assembly Elastomer Bearing BB 10 - 200 kg

Assembly procedures: (Numbering see Fig 2-3)
1. Load cell preparation:
A data sheet is supplied with every load cell with the calibration values for that
load cell. This is found in a supply pocket which is stuck on the packaging. Take
the data sheet and store it in a safe place.
Unpack the load cell.
2. Base plate preparation:
Unpack the base plate.
3. Elastomer bearing preparation:
Unpack the elastomer bearing (10).
4. Assemble the elastomer bearing unit:
NOTE
Please follow the guidelines from chapter 1.5 Load Cell Handling when working
with load cells.
CAUTION
An incorrect or incomplete assembly can result in damaging load cells, mounting
components and the loading platform.
DANGER
A falling loading platform can result in death, severe injury or damage to
equipment depending on exposure.
Document-No.: A5E00295975A
Elastomer bearing
Page 16