Cascade configuration level.
The parameters included in this section refer to the connection of boilers in cascade. The visualization is possible only when more boilers are controlled
by the regulator.
PARAmETER
Description
01
Common delivery temperature differential
02
Start delay
03
Stop delay
04
Boilers switching-on heat output
05
Boiler sequence inversal
06
Primary stage
07
Peak boiler from address
08
Peak boilers change with standard
BUS data configuration level.
PARAmETER
Description
01
Regulator BUS address
02
Configuration of direct circuit remote control
03
Configuration of mixed circuit 1 remote control
04
Configuration of mixed circuit 2 remote control
Regulation
Setting range / Parameters
10
0,5 ... 30 K
0
0 ... 200 Min
0
0 ... 60 Min
65
10 ... 100 % Nominal heat output
OFF
OFF, 1 ... 240 h
1
1 ... n (stages number)
OFF
3 ... n (stages number)
OFF
OFF, ON
Regulation
Setting range / Parameters
10
10, 20, 30, 40, 50
2
1
Parameters modification of all circuits
2
Parameters modification of Direct Circuit only
2
1
Parameters modification of all circuits
2
Parameters modification of Mixed Circuit 1 only
2
1
Parameters modification of all circuits
2
Parameters modification of Mixed Circuit 2 only
Page 34