Palazzetti Inserimento A70 Installation, User And Maintenance Manual page 40

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 26
6.6 CREATION OF UTILITY HOLES ON
CLADDING
Cladding is to be made only by qualified personnel.
Utility holes must be made in the cladding for the
following:
A) display slot;
B) ventilation vents;
C) heat release in hood;
D) ventilation of cladding on base;
E) Loading of pellets onto hood;
The holes must comply with the measurements
shown in Fig. 6.6.1.
6.7 CONNECTION TO SYSTEMS
6.7.1 Electrical connection
Simply connect the stove to the electricity mains
with the plug supplied.
The electrical connection (plug) must be easy to
access also after the stove has been installed.
If the power lead is damaged it must be replaced
by the technical assistance service or a qualified
electrician to prevent all risks.
6.7.1.1 Earthing
DANGER
The system must be earthed and fitted with a circuit
breaker as provided for by current laws (Fig. 6.7.1).
The flue must have its own earth connection.
6.7.2 Control panel installation
The fireplace's control panel can be wall mounted
using box (fig 6.7.2).
DANGER
Do not install the recessed box on the hood.
Place the passage of the cable between the panel
and the electronic card so that it is not damaged by
the temperature of the fireplace at normal operating
temperature.
Connect the cable between the terminals of the
electronic card and the control panel before closing
the boxes.
6.7.3 Connection to room thermostat
The stove can be connected to an external timer
thermostat that switches the stove on or off
according to the set temperature.
For electrical connection, refer to the wiring diagram
in the technical specifications.
40
INSTALLATION
00 4776070 - 17/12/2018 - PN - Italy
E
2 9
5
2 9
1 1
5
A
C
B
5
E
Fig. 6.6.1
D
Fig. 6.7.1
Fig. 6.7.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Inserimento ac70

Table of Contents